March 2, 2019 Lower Range Work Day

Additional work day on lower range

Due to the wonderful weather we’ve been having, there probably won’t be a lot of work done outside of the shelter on the lower range during this Saturday’s workday. Dennis has asked me to put another workday on the schedule for March 2nd.

As far as I know, he’s still planning on being there this Saturday too. Check back tomorrow, I’ll know for sure by then.

Confirmed. He will be there this Saturday the 23rd. The target stands in the shed need work and the target backers for 100 yard belts can be prepared so they can be put up quickly once it does finally stop raining.